| Installation of the degassing unit (27th Jul 22 at 6:03am UTC) Installation of the degassing unit | | Switch off the heating unit after porous-ceramic-filter-product heating is completed. Guide inert gas into the rotor and release molten aluminum into the box when the heater temperature is closed to molten aluminum temperature.
Check the sealing between inlet/outlet and launder.
Check the cone located in heat protection draining in the bottom.
Check the molten aluminum temperature (min 720°C). Make the height of molten aluminum be away from the launder bottom at 3cm for observing the molten aluminum going into thebox.
The operator shall wear protective clothes to close the cover. The slag on the surface can be skimmed through the porous-ceramic-filter-product when the molten aluminum flows into the box.
Start production when the temperature is up to 780°C. Close porous-ceramic-filter-product outlet for heating preservation.
Molten aluminum can be retained in the box with setting temperature during the heat preservation phase but with no molten aluminum handling.
Guide inert gases into the rotor to prevent air outlet blocking by molten aluminum.
Switch on the heater as soon as molten aluminum flow into the box is completed and set heat preservation parameters.
Starting the heating system, control the temperature of the molten aluminum, monitor the gas flow rate, and the speed of the rotor is changed from the heat preservation stage to the processing stage. At the same time, the inert gas flow into the rotor increases, and the gas flow rate is changed from the preservation stage to the processing stage.
The operator sets the molten aluminum heating temperature and maintains a stable porous-ceramic-filter-product working condition.
| |
|
Tony Murray Veteran Member
     Posts: 500 Status: Offline Joined:
pm
| | Re: Installation of the degassing unit (2nd Oct 22 at 12:06pm UTC) | | Find the best essays on is my friend's profile page.Pest Control Orlando
| |
|
Tony Murray Veteran Member
     Posts: 500 Status: Offline Joined:
pm
| | Re: Installation of the degassing unit (2nd Oct 22 at 12:09pm UTC) | | This is very significant, and yet necessary towards just click this unique backlink:Pest Control Tampa
| |
|